7 m大采高“刀把”形综采工作面矿压规律研究

    Research on Strata Behavior Laws of “Hilt-shape” Fully Mechanized Working Face with 7 m Large Mining Height

    • 摘要: 为确保7 m大采高“刀把”形工作面短、长面对接期间顶板安全,通过对大柳塔矿52304“刀把”形综采工作面初采阶段矿压规律进行实测,分析得出受52304-1工作面开采区域面长较小、其上覆基岩关键层所处层位较低、断裂步距较大、其下直接顶的碎胀系数较大等因素作用,7 m大采高“刀把”工作面初采阶段呈现出初次来压步距较长、来压强度较低的矿压规律,该矿压规律有利于“刀把”形工作面由短变长对接区域的顶板管理。

       

      Abstract: In order to ensure roof safety during the connecting period of short and long faces at “hilt-shape” working face with 7 meters mining height, through the actual measurement of strata behavior laws at 52304 “hilt-shape” fully mechanized working face in initial stage, influenced by the shorter face of 52304-1 mining area, the lower key layer of overlying rock, the larger fracture length, the larger coefficient of direct roof, it presents the mine pressure laws of longer initial pressure step, lower pressure strength at “hilt-shape” working face with 7 meters mining height in initial mining stage, which is in favor of roof control in the connecting area of changing the "hilt" face form from short to long.

       

    /

    返回文章
    返回