综放初采期深孔预裂爆破弱化顶板的试验研究

李超, 康天合, 张彬

李超, 康天合, 张彬. 综放初采期深孔预裂爆破弱化顶板的试验研究[J]. 煤矿安全, 2015, 46(10): 28-31.
引用本文: 李超, 康天合, 张彬. 综放初采期深孔预裂爆破弱化顶板的试验研究[J]. 煤矿安全, 2015, 46(10): 28-31.
LI Chao, KANG Tianhe, ZHANG Bin. Experimental Study on Weakening Hard Roof by Pre-splitting Blasting During Initial Mining at Fully-mechanized Caving Face[J]. Safety in Coal Mines, 2015, 46(10): 28-31.
Citation: LI Chao, KANG Tianhe, ZHANG Bin. Experimental Study on Weakening Hard Roof by Pre-splitting Blasting During Initial Mining at Fully-mechanized Caving Face[J]. Safety in Coal Mines, 2015, 46(10): 28-31.

综放初采期深孔预裂爆破弱化顶板的试验研究

Experimental Study on Weakening Hard Roof by Pre-splitting Blasting During Initial Mining at Fully-mechanized Caving Face

  • 摘要: 针对坚硬顶板初次断裂步距大容易引起冲击矿压、瓦斯积聚以及在放顶煤开采中降低初采期间顶煤放出率等问题,对唐安煤矿3301综放工作面进行深孔预裂爆破弱化顶板的设计并进行现场试验。试验表明:优化的炮眼间距、炮眼仰角等爆破参数合理,爆破能够使顶板预裂并改变其受力状态;工作面基本顶初次断裂步距成功地缩短了38.43 m,可增加产量22 801 t;基本顶提前垮落,避免冲击矿压问题,同时避免采空区通风困难导致的瓦斯积聚问题。
    Abstract: To solve the problems such as rock burst, gas accumulation and the low recovery rate of top coal during the initial mining of top coal caving mining caused by hard roof which is hard to break down, the design and field test of weakening roof at 3301 fully-mechanized caving face of Tang'an Coal Mine with the method of deep-hole pre-splitting blasting was set up. The results show that the optimal blasting parameters such as blast hole spacing, hole elevation were reasonable and the blasting can make the roof pre-splitting and change its stress state; the initial roof fracture step distance was shortened by 38.43 m, and the yield increased by 22 801 t. The caving of main roof in advance solves problems of rock burst and gas accumulation in gob result from ventilation difficulties.
  • [1] 史元伟. 采煤工作面围岩控制原理和技术[M].徐州:中国矿业大学出版社,2005:46-50.
    [2] 宋永津. 注水、压裂、弱化-控制煤层坚硬难冒顶板技术[M].北京:煤炭工业出版社,2002:6-9.
    [3] 陈炎光,钱鸣高. 中国煤矿采场围岩控制[M].徐州:中国矿业大学出版社,1994:18-21.
    [4] 崔永杰,孙琪,郑跃兵,等. 坚硬顶板弱化处理防止瓦斯骤然涌出[J].煤炭技术,2011,30(12):80-82.
    [5] 沈玉旭,康天合,杨永康,等. 综放初采顶板深孔预裂爆破的研究与实践[J].矿业研究与开发,2013,33(4):122-125.
    [6] 王岩,梁冰,袁欣鹏. 易自然煤层综放工作面安全开采方法研究[J].采矿与安全工程学报,2012,29(5):730-734.
    [7] 郭卫彬,刘长友,吴锋锋,等. 坚硬顶板大采高工作面压架事故及支架阻力分析[J].煤炭学报,2014,39(7):1212-1219.
    [8] 康天合,柴肇云,李义宝,等.底层大采高综放全厚开采20 m特厚中硬煤层的物理模拟研究[J].岩石力学与工程学报,2007,26(5):1065-1072.
    [9] 贾喜荣. 岩石力学与岩层控制[M].徐州:中国矿业大学出版社,2010:67-70.
    [10] 钱鸣高,刘听成. 矿山压力及其控制[M].北京:煤炭工业出版社,1991:45-46.
    [11] 郭德勇,商登莹,吕鹏飞,等. 深孔聚能爆破坚硬顶板弱化试验研究[J].煤炭学报,2013,38(7):1149.
计量
  • 文章访问数:  266
  • HTML全文浏览量:  2
  • PDF下载量:  1
  • 被引次数: 0
出版历程
  • 发布日期:  2015-10-19