    • 摘要: 针对赵固地区地质采矿条件,分析该地区的开采损害特点,提出2种方案积极去解决因开采沉陷引起的地表积水对矿区生态破坏以及矿井安全生产的威胁等问题,通过对赵固地区地表水综合治理方案的分析,得出巨厚松散层高潜水位平原煤矿开采沉陷区地表水的治理模式,实现煤炭的开采与灾害治理同步,避免出现破坏后难治理的情况。

       

      Abstract: According to geological and mining conditions of Zhaogu region, the characteristics of mining damage are analyzed, two kinds of schemes are actively proposed to solve safety threat of surface water problem caused by mining subsidence and ecological damage in mining area and mine production, through the analysis of comprehensive treatment of the surface water scheme in Zhaogu region, the surface water treatment model of super thick unconsolidated layer of high groundwater water level in plain coal mining subsidence area is obtained, the synchronization of coal mining and disaster control is achieved, which avoids damage difficult after treatment.

       

    /