    • 摘要: 为探索采动稳定区瓦斯地面开发技术,首次在松藻矿区开展了采动稳定区瓦斯地面抽采试验项目,完成地面井2口。通过钻井实践,掌握了松藻煤矿采动稳定区上覆岩层特点,总结了采动稳定区地面井难点及对策,初步形成一套适合松藻煤矿采动稳定区地面井的施工工艺,给松藻采动稳定区后续地面井施工提供参考。

       

      Abstract: In order to explore the gas extraction technology in mining-affected stable region, ground holes are completed to pump coal-bed methane in stable mining-affected region in Songzao Coal Mine for the first time. According to the drilling practice, the strata characteristics over stable mining-affected region are obtained, the drilling difficulties and corresponding measures are discussed, the reasons of drilling accidents are analyzed. At last, the drilling technique for stable mining-affected region in Songzao Coal Mine is formed, which provides the conference for further drilling operation in the district.

       

    /