    • 摘要: 为揭示混凝土填充墙支护下综采沿空回采巷道矿压显现规律,有效控制围岩变形,根据某矿综采面地质与开采条件,应用数值计算方法研究采后留巷的稳定性。数据分析显示:混凝土墙支护下沿空留巷围岩应力随采煤工作面推进呈周期性变化,采后20 m范围的巷道围岩来压较剧烈,是重点支护区域;巷道围岩位移量随采煤工作面的推进而增大,其中巷帮移近量较小,而顶板下沉量较大,表明采用混凝土墙支护沿空留巷有利于巷帮的稳定,但不利于顶板稳定。

       

      Abstract: In order to reveal strata-pressure behavior laws of gob-side entry retaining under concrete filled wall support,and control rock deformation effectively,the retained roadway's stability is researched by numerical calculation based on geology and mining conditions of a mine.The results indicate that rock stress of gob-side entry retaining shows cyclical changes with advancing of coal workface;the pressure of surrounding rock is more intense in 20 m ranges of roadway after mining,which is the key support region.The deformation of surrounding rock becomes larger with advancing of coal workface,and the displacement of laneway's side is smaller,the sinkage of roof is bigger.It shows that concrete filled wall support is good for stability of laneway's side,but is not good for roadway roof.

       

    /

    返回文章
    返回