厚煤层顶板定向钻孔技术研究与应用

    Research and Application of Directional Drilling Technology for Thick Coal Seam Roof

    • 摘要: 保德煤矿三盘区深部大巷延伸为全煤巷道,区域煤层厚度7.4 m以上,巷道沿煤层底板掘进,巷道高度3.8 m。通过在三盘区深部大巷延伸区域沿8#煤层顶板施工下行定向长钻孔对掘进区域进行超前预抽,大幅降低了掘进区域瓦斯压力和瓦斯含量;巷道掘进形成自由空间从而产生微裂松动区,进而增加了围岩的透气性,在巷道掘进期间顶板煤层定向钻孔作为煤层顶板高抽孔抽放,降低了掘进工作面瓦斯涌出量并解决了巷道层流问题。通过采取厚煤层顶板定向钻孔技术,掘进工作面瓦斯问题得到了合理解决。

       

      Abstract: In Baode Coal Mine, the deep main roadway of the third panel area spreads and becomes whole coal roadway. The thickness of regional coal seam is more than 7.4 m, the roadway excavation is carried out along the coal seam floor, and the height of roadway is 3.8 m. By constructing downward long directional drilling along the 8# coal seam roof in the extension area of deep main roadway in the third panel area, the advanced pre-pumping is conducted in the excavation area, the gas pressure and the gas content decreases greatly. The roadway excavation causes the formation of free space, and produces micro-crack loose zone, thereby increases the permeability of the surrounding rock. During the roadway excavation, the directional drilling of coal seam roof is taken as highly-located hole pumping in coal seam roof, which reduces the amount of gas emission in heading face and solves the problem of roadway laminar flow. By using the directional drilling technology for thick coal seam roof, the gas problems of heading faces are solved reasonably.

       

    /

    返回文章
    返回