基于GIS的煤矿采掘衔接图表联动方法

    Chart Linkage Method for Coal Mine Mining-excavation Relay Based on GIS

    • 摘要: 采掘工程衔接计划作为生产矿井的一项重要内容,经常需要调整以适应矿井的实际生产,从实用出发,利用GIS平台建立采掘衔接单元体模型,用数据库存储采掘衔接数据,在采掘图和采掘表间建立一一对应关系,实现图表联动,从而实现采掘图、采掘表的相互生成和更新,探索一种快速调整采掘衔接计划的可行方法。

       

      Abstract: Mining-excavation relay plan is an important content in the production process of coal mine, it often need to adjust to adapt for the actual production of the mine. From the actual production, the study established the unit model for mining-excavation by GIS platform, and stored the data of mining-excavation by database. The study built a one-to-one correspondence between the mining figures and the mining grids, and realized the chart linkage, mutual generation and update of the mining figures and the mining grids. The study explores a rapid adjusting feasible method for mining-excavation relay plan.

       

    /

    返回文章