协庄煤矿接地系统的改进

    Improvement of Grounding System in Xiezhuang Coal Mine

    • 摘要: 根据《煤矿安全规程》并结合现场实际,提出采用镀铜钢绞线接地系统来替代镀锌扁钢接地系统,系统地介绍了主要部件相关的连接安装方法,并进行了接地摇测,测试结果完全符合安全规程的要求,能够很好的解决矿井下不能烧焊施工的实际,并提高了安装工作效率及接地系统的可靠性。

       

      Abstract: Based on Coal Mine Safety Regulations and combined with actual site,the article proposed a method using grounding system of copper coated steel wire to instead of grounding system of galvanized flat steel.It systematically introduced connection and installation method of main components,and made grounding shake test.The test results were in line with the requirements of safety regulations.The method can well sovle the actual that coal mine can not welding construction,and improve the efficiency of installation work and reliability of grounding system.

       

    /

    返回文章
    返回