余吾煤业深部综放工作面上覆岩层运移特征

    Overburden Rock Migration Characteristics at Deep Fully-mechanized Caving Face in Yuwu Mining Company

    • 摘要: 以余吾煤业为试验矿井,通过UDEC数值模拟软件和相似材料模拟试验研究和对覆岩“两带”动态发育特征进行了模拟分析;并通过井下钻孔电视探测,对余吾煤业深部综放工作面的裂隙发育情况实际情况进行了现场测定,可知:余吾煤业深部综放工作面冒落带和裂隙带的高度分别为33 m左右和57 m左右;不同推进距离下,同一煤岩层的应力集中系数均先增大而后稳定在一个固定值;工作面中部的离层量很小,两端离层量较多;动态的裂隙发育宽度多以小于25 mm的为主。

       

      Abstract: Taking Yuwu Mining Company as the experimental mine, numerical simulation software and similar material simulation experiment is used to research "two zones" of overburden rock dynamic development features; and underground borehole television is taken to detect fractures development situations in Yuwu Mining Company deep full-mechanized caving face. The results show that the height of caving zone and the fractured zone is respectively about 33 m and 57 m around in Yuwu Mining Company deep full-mechanized caving face. With different advancing distance, the stress concentration coefficients of the same coal strata firstly increased and then stabilized in a fixed value. Abscission layer on both ends of the working face is big, but in the middle of abscission volume is small. Dynamic fracture development width is mainly less than 25 mm.

       

    /

    返回文章
    返回