任楼煤矿提高回采上限首采面突水溃砂原因分析

    Cause Analysis of Water and Sand Inrush at the First Working Face of Improving Mining Upper Limit in Renlou Coal Mine

    • 摘要: 针对任楼煤矿首个提高回采上限工作面回采过程中发生的突水、溃砂事故,从覆岩结构、矿压显现、支架阻力等角度,对突水溃砂的原因进行了分析。结果表明,风巷顶板破坏并沿巷帮发生失稳导致顶板侧向支承结构消失,周期来压期间覆岩整体破断时支架阻力不足、支护不及时而导致覆岩砌体梁结构失稳、端面漏冒加剧,进而造成严重突水溃砂。在后期的复采过程中,提高支架阻力、修复变形严重的风巷、改变巷道支护形式、完善排水系统以及加强工作面支护管理是防范突水溃砂的主要手段。

       

      Abstract: Aiming at the disaster of water and sand inrush in the first working face of improving mining upper limit of Renlou Mine, this paper analyzes the causes combined with the overburden structure, strata behaviors and support resistance. The results show that wind lane roof damage and occurred instability along the laneway's side lead to the roof lateral support structure disappeared. Lack of support resistance, not timely support in overall breaking of the overlying strata during periodic weighting period leads to the structural instability of overburden rock masonry beam, serious leakage at the end face, which causes serious water and sand inrush. In the latter repeated mining process, improving support resistance, repairing deformed wind lane, changing the support form of roadway and improving drainage systems and strengthening the support management of working face are main means to prevent the water and sand inrush.

       

    /

    返回文章
    返回