煤层开采后覆岩导水裂隙带高度的模拟研究
Simulation Study on the Height of Water Flowing Fractured Zone After Coal Seam Mining
-
摘要: 某矿为安全开采煤炭资源,采用经验公式预计和计算机数值模拟方法,按规划设计开采煤层厚度分别研究了单独开采16#煤、17#煤后覆岩导水裂隙带高度,采用经验公式计算为36.1 m和29.7 m;采用计算机模拟方法计算为37.1 m、26.9 m。研究了按规划设计开采煤层厚度将16#煤、17#煤全采后覆岩导水裂隙带高度为41.7 m。Abstract: For the safe mining of coal resource, depending on the designing mining height, a mine applied the two methods of empirical formula and numerical simulation to study the height of water flowing fractured zone of 16# and 17# coal seams which are exploited alone. The result shows that these two values are 36.1 m and 29.7 m according to the empirical formula, and 37.1 m and 26.9 m according to computer simulation. Depending on the designing mining height, the height of water flowing fractured zone of 16# and 17# coal seams after mining is 41.7 m according to computer simulation.
-
-
[1] 何国清,杨伦.矿山开采沉陷学[M].徐州:中国矿业大学出版社,1991. [2] 唐春安, 于广明,刘红元,等.采动岩体破裂与岩层移动数值实验[M].长春:吉林大学出版社,2003. [3] 唐春安, 王述红,傅宇方.岩石破裂过程数值实验[M].北京: 科学出版社,2003. [4] 刘红元, 刘建新, 唐春安.采动影响下覆岩垮落过程的数值模拟[J].岩土工程学报, 2001,23(3):201-204. [5] 王双美.导水裂隙带高度研究方法概述[J].江苏地质,2006,30(1):64-66. [6] 刘保卫.采场上覆岩层“三带”高度与岩性的关系[J].煤炭技术,2009,28(8):56-57. [7] 栾元重.近距煤层开采覆岩导水裂隙带高度观测研究[J].采矿与安全工程学报,2010,27(1):139-142.
计量
- 文章访问数:
- HTML全文浏览量: 0
- PDF下载量: 0